If you would like to reply to this thread, please log in. If you do not have an Ask the Experts forum user account, create one here.
If you would like to reply to this thread, please log in. If you do not have an Ask the Experts forum user account, create one here.
It would be a lot of help to me to have installation instructions for my transition from 4/12 top attached standing seam metal roof to a flat roof that will have 3" ISO w a peel and stick barrier and peel and stick SBS Modified Bitumen.
Will I need to install Transition metal under the pitched roof metal and over the completed flat roof bitumen?
I am trying to understand the procedure before going forward with my roof project.
Thank everyone,
David
Transition 4/12 Standing Seam Metal Roof to Flat 3" ISO w Peel and Stick
1/24/2024
I would really suggest going back to the standing seam manufacturer for their instructions but, yes, you will want a transition flashing. You have to be careful to make sure the flashing doesn't develop a negative pitch. Also, I highly recommend thinking about making it "easy" to someday replace the flat roof without having to disturb the standing seam.
Isaiah Industries, Inc.
1/25/2024